Surat, Gujarat: Surat Railway Station Demolition under Phase 2 of the Surat Multi-Modal Transport Hub (MMTH) project. The station’s 74-year-old historic building is scheduled to be demolished in December 2026 to make way for redevelopment, while Platform No. 1 will reportedly be temporarily closed during the construction work.
The redevelopment is expected to affect railway operations, with the timetable of approximately 150 trains likely to change. Some trains may also operate from or depart from Udhna Railway Station instead of Surat Railway Station.
Passengers travelling from Surat are advised to check their train status, departure station and platform details before beginning their journey.
Surat Railway Station’s Historic Building to Make Way for Redevelopment
The existing Surat Railway Station Demolition has served passengers for approximately 74 years and is an important part of Surat’s railway history.
Under Phase 2 of the MMTH project, the old structure is scheduled to be demolished as part of the station’s redevelopment. The wider project aims to transform the station area into a modern transport hub with improved connectivity and passenger facilities. The redevelopment is expected to bring significant changes to the station’s existing infrastructure and railway operations.
Platform No. 1 to Be Temporarily Closed Surat Railway Station Demolition
As part of the planned construction work, Platform No. 1 at Surat Railway Station will reportedly be closed temporarily.
The closure may require changes to train operations and passenger movement within the station. Railway authorities are also expected to relocate station offices to the Platform No. 4 side. Passengers should allow additional time to reach their boarding points and follow announcements and instructions displayed at the station.
Timetable Changes Expected for Around 150 Trains
The redevelopment work is expected to affect the schedules of approximately 150 trains passing through Surat.
Possible changes include revised arrival and departure times, platform allocations and changes to the originating or terminating station for selected services. Some trains may operate from Udhna Railway Station rather than Surat Railway Station during the affected period. However, the final list of affected trains, revised schedules and implementation dates should be confirmed through official Western Railway announcements.
Passengers Advised to Check Train Status Before Travelling
With the proposed changes likely to affect regular railway operations, passengers should take the following precautions:
- Check the latest train schedule before leaving home.
- Confirm whether the train departs from Surat or Udhna Railway Station.
- Verify the platform number on the day of travel.
- Follow official railway announcements regarding cancellations, diversions and revised timings.
- Allow extra travel time if boarding from a different station.
Passengers can check train information through the official Indian Railways enquiry services and the NTES (National Train Enquiry System).
Surat MMTH Project to Transform Railway Connectivity
The Surat Multi-Modal Transport Hub project is intended to integrate railway services with other modes of public transport and improve connectivity around one of Gujarat’s busiest urban centres.
The second phase is expected to bring substantial changes to the existing station infrastructure. While the transition may cause temporary inconvenience, the redevelopment is aimed at modernising the station and improving the passenger experience over the longer term.
Conclusion: The planned demolition of Surat Railway Station’s 74-year-old building marks a major milestone in the city’s transport redevelopment. With Platform No. 1 expected to close temporarily and around 150 trains potentially affected, passengers should monitor official railway updates before travelling in December 2026.
Also read, Indian Women’s Cricket Team Arrives in Vadodara Ahead of Zimbabwe ODI Series
Watch Latest News Videos on KRH News: Click Here

